For people who plan, present, and teach with a whiteboard

Finish the session with a digital copy of the ideas you worked through.

Write, add images, and map out next steps on Veld’s 75-inch interactive board. Then save the whiteboard work and share it with the people who need it.

Book a demo

Tell us how you work, then choose a demo time.

75-inch interactive display · 3-year limited panel and parts warranty

  • Google EDLA certifiedLicensed for Google Play, so Workspace and Microsoft 365 apps run on the board itself.
  • 3-year limited warrantyLCD panel and parts, with 12 months on accessories. Terms and exclusions apply.
  • 4K screen, 50 touch points8-core processor, 7H protective glass and an 8-microphone array.
  • Free shipping in the USContinental United States, and most orders ship in 1 to 3 business days.
In use at MakeInspires Mizzentop Day School Incarnation Catholic Academy

The work on the board becomes a file you can take away.

A project plan written on the Veld whiteboard
The plan created on Veld.
Placeholder Same plan on a phone The same project plan, received after scanning the QR code
The file received on a phone.

Create it during the conversation. Keep it when you’re done.

  1. 1
    Handwritten planning notes and a sketch on the Veld whiteboard

    Write out the idea

    Sketch a process, work through a plan, or add the next steps as you talk.

  2. 2
    An image placed onto the Veld whiteboard canvas, with the page controls visible

    Give it the room it needs

    Bring an image into the whiteboard canvas or add another page when the discussion grows.

  3. 3
    The Veld whiteboard save dialog, offering JPG, PNG, PDF and other file types

    Save and share the work

    Save the whiteboard work or display its sharing QR code. Scan it with your phone to receive the file, ready to send on.

Choose a screen for the work you actually do.

If you only need to show slides, a TV may be enough. If you regularly draw things out and want to keep the work, compare what happens during and after the discussion.

Comparison of a TV with a laptop, a dry-erase board, and Veld Board
Task TV with a laptop Dry-erase board Veld Board
Show prepared content. Yes. Presentations and connected software. Not on its own. Yes. Compatible apps or a connected laptop.
Write directly on the surface. Not on a standard TV screen. Yes, with markers. Yes, with a stylus or your finger.
Keep the whiteboard work. If the work happens in laptop software. Take a photo before erasing. Save the whiteboard as a digital file.
Receive the work on a phone. Depends on the laptop software. Send the photo yourself. Scan the sharing QR code.

Swipe the table to compare

Already considering another interactive board? Ask to see the same writing, saving, and sharing task on each one.

Teams already running Veld Boards.

Three of the organizations using Veld Board today, in their own words.

A Veld Board installed at a MakeInspires makerspace
“We are very happy with how Veld Board enhances our makerspaces. We have them in all our locations and are planning on adding more as we expand. They have worked perfectly with no issues.”
MakeInspires
Travis SlussCEO, MakeInspires
“I’m really happy I chose Veld Board for our school. The features and power of the 75 inch are great.”
Mizzentop Day School
Shane CaroppoliIT Manager, Mizzentop Day School
“The user-friendly interface and versatile connectivity tools have significantly strengthened engagement. We confidently recommend them.”
Incarnation Catholic Academy
Catherine LucasPre-K Educational Director, Incarnation Catholic Academy

Want a reference closer to your own setup? Ask on the demo call.

Veld Board 75-inch interactive display

A board you can write on, with the essentials to get started.

  • 75-inch interactive display.
  • Two styluses and a wall mount kit included.
  • Free shipping in the continental United States.
  • No required Veld subscription for core board functions.
  • Google Play access for compatible apps. Paid third-party apps are separate.

Warranty

Three-year limited warranty on LCD panels and parts. Accessories have separate 12-month coverage. Terms and exclusions apply.

Read the full warranty terms

We’ll discuss pricing and any setup extras during your demo and quote process.

The front-facing ports on Veld Board: USB-C, USB-A, HDMI and touch

See whether Veld fits the way you work before you buy.

Bring a task you normally explain on a whiteboard. We’ll walk through the board and discuss the space, apps, and devices you plan to use.

The application takes about a minute

  1. 1
    Your work. How you would use Veld and what you use a whiteboard for most.
  2. 2
    Your plans. Timing, your role in the decision and quantity.
  3. 3
    Your details. Then pick a demo time.

Prototype form. Nothing you enter here is sent or stored.

A few things to know before your demo.

Is this useful if I already have a TV or monitor?
If you mostly show slides, your TV may be all you need. Veld adds a surface you write on directly and a way to save and share that work. It’s most useful if you regularly draw things out.
Can I use it in a home or small office?
Yes. Veld Board is made for conference rooms, classrooms, and home offices, and it ships with a wall mount kit. It’s a large 75-inch display, so bring your wall and room details to the demo.
How do I share what I write?
Save the whiteboard as a picture or PDF, or display its sharing QR code. Scanning the code opens a page where the board can be saved to the phone. QR sharing is set up for devices on the same network by default.
Can I use my existing apps and laptop?
The board runs compatible Google Play apps, and you can connect a laptop with the included HDMI cable. What works depends on your exact apps and devices, so list them in the application and we’ll check them during the demo.
Can I use it for video calls?
Veld Board has built-in speakers and microphones and can run compatible meeting apps. Camera video needs an external camera, which isn’t included. Tell us your meeting app and we’ll talk through the setup.
Do I need a subscription?
No Veld subscription is required for core board functions. Some third-party apps charge for their own plans.
What’s included, and what costs extra?
The board comes with two styluses and a wall mount kit, and shipping is free in the continental United States. Installation, a mobile stand, a camera, and paid apps are not included. We’ll cover pricing and any extras in your demo and quote.
What does the warranty cover?
LCD panels and parts have a three-year limited warranty, and accessories have 12 months. It covers defects under the warranty terms. It’s limited coverage, not a money-back guarantee, and exclusions apply. Read the full warranty terms

Bring the task you normally reach for a whiteboard to explain.

See how you could keep that work when the conversation ends. Tell us about your setup and book your Veld demo.

Book a demo

Short questionnaire first. Demo time next.

A presenter using Veld Board in an office meeting